Consider factoring only after comparing the complete fee, usable advance, payment timing and remaining job profit with alternatives you can actually obtain. In this hypothetical $20,000 net-60 example, an 85% advance supplies $17,000 now, but $1,200 of fees consumes 30% of the job's original $4,000 profit. Factoring can address a cash gap; it cannot repair an order that was underpriced before financing.

See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.

Follow both the advance and the reserve

Assume a delivered batch of 200 stainless shafts invoices for $20,000 and has fully allocated job cost of $16,000. A fictional factor offers an 85% advance, charges 2.5% of invoice face value for each started 30-day period, and adds $200 of total other fees. Assume the buyer pays exactly on day 60, triggering two periods, with no disputed parts, deductions or chargebacks. These are demonstration terms, not a market average or an offer.

The factor advances $17,000 and initially holds a $3,000 reserve. Its time fee is $20,000 × 2.5% × 2 = $1,000; total fees become $1,200. After collecting the full invoice, it releases $1,800 of reserve. The shop receives $18,800 overall, leaving $2,800 above the original job cost. The reserve was delayed cash, not an additional $3,000 expense.

Example cash ledger, assuming full payment on day 60
EventCalculationCash or cost
Initial advance$20,000 × 85%$17,000 received
Reserve held initially$20,000 − $17,000$3,000 delayed
Two-period time fee$20,000 × 2.5% × 2$1,000 cost
Other assumed feesContract assumption$200 cost
Reserve released$3,000 − $1,200$1,800 received
Total profit after fees$17,000 + $1,800 − $16,000$2,800

A small delay can trigger another billing period

Under the assumed started-period rule, payment on day 61 instead of day 60 triggers a third $500 time fee. Total fees rise to $1,700, reserve released falls to $1,300 and remaining profit falls to $2,300. Ask the provider to price your customer's actual payment pattern, including approval delays and inspection holds, rather than the nominal net term alone.

The Federal Reserve's March 2025 explanation describes factoring as selling unpaid invoices at a discount, with the factor collecting from the customer and retaining a fee. It also explains why a factor rate is different from an APR. For this example, $1,200 / $17,000 × 365 / 60 = 42.94% is only a simple annualized cost comparison; actual timing, retained reserves and fee deductions affect a fuller cash-flow calculation.

Compare equal amounts of cash over equal days

For illustration, borrowing $17,000 for 60 days at an assumed 12% simple annual rate costs $335.34 before fees. That is cheaper than the example factoring fee, but only useful if the credit is approved and available when needed. An agreed material deposit or progress invoice may reduce the amount financed before the order is complete. Do not compare a deposit arriving before production with a factor advance arriving after delivery as if their timing were identical.

Read the proposed agreement for recourse, customer disputes, reserve release, minimum volume, unused-line fees, termination fees and any claim on other receivables. Ask exactly who bears nonpayment and what events permit the factor to demand repayment. A nonrecourse label is not enough information to assume that rejected parts or a buyer's debit memo are covered.

Prepare a decision sheet before signing

List one real invoice, its cost, earliest eligible funding date, net advance after upfront deductions, expected collection date and every fee. Run a second case with collection one billing period later. Have the provider confirm both cases in writing, including the reserve release date and customer notification process.

Then compare the fee with the contribution from the next order the advance would make possible. If the shop repeatedly needs financing to replace margin lost on the previous batch, correct pricing and payment terms first. Use accounting and legal advisers to review the actual financing agreement; the arithmetic here cannot establish its risk allocation.

Sources and limits

Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.

  • The Federal Reserve's March 2025 financing discussion explains invoice sales, collection by factors and why factor rates are not comparable to APRs without further analysis. — source (checked 2026-10-30)
  • Advance percentage, fees, borrowing rate, collection dates and job costs are fictional inputs. No prevailing factoring rate or eligibility claim is made.

Price one of your own parts

Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.

Your STEP file or PDF drawing

Free. No account, no email. Priced at our default US rates until you set yours.