Answers · Updated 2026-10-30

What is an average machine shop rate in 2026?

Your part priced in about 90 seconds, no account.

There is no official 2026 average for a US machine shop. The published figures I could verify are individual examples: Nox Metals lists $75–$125/hour for standard 3-axis milling, $100–$175 for 5-axis, and $60–$90 for CNC turning (page updated April 2026); NORAMARK says $75–$150/hour for 3-axis milling and turning and $125–$250 for 5-axis and Swiss work (checked October 30, 2026). Those are reference points, not a market survey. For your own quote, start with your break-even rate: a $312,000 annual cost divided by 2,080 staffed hours at 70% billable utilization is $214.29/hour before profit, or $246.43/hour with a 15% markup.

See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.

Read a published rate without turning it into an average

Nox Metals publishes a range on its shop-rate calculator, and NORAMARK publishes a separate range in its CNC cost guide. Their pages describe different businesses and do not promise the same inclusions: material, setup, programming, inspection, tooling and outside processing may sit outside the hourly number. The dates matter because rates, wages and utilization move. Keep the source URL and the checked date beside any planning number you copy into a spreadsheet.

The useful conclusion is not that every 3-axis shop should charge $100/hour. It is that a buyer should ask what the rate covers and a shop should explain its own cost model. A high rate with short cycle time can beat a low rate with a long setup; comparing only the hourly figure hides that trade.

Published US examples checked October 30, 2026
Publisher and datePublished figureScope stated by publisher
Nox Metals, updated April 2026$75–$125/h 3-axis; $100–$175/h 5-axis; $60–$90/h turningCalculator guidance; rates vary by capability and region
NORAMARK, checked 2026-10-30$75–$150/h 3-axis/turning; $125–$250/h 5-axis/SwissCost guide; material and setup may be additional

Compute the rate your shop has to recover

Use annual cost ÷ billable hours for break-even, then decide on a margin. In the worked example, annual cost is $312,000: $96,000 loaded labor, $72,000 rent and utilities, $54,000 machine payments and depreciation, $28,000 maintenance and tooling, $22,000 software, insurance and quality, and $40,000 owner and office overhead. A 2,080-hour staffed year at 70% utilization gives 1,456 billable hours. $312,000 ÷ 1,456 = $214.29/hour. Applying a 15% markup gives $246.43/hour. This is arithmetic from stated assumptions, not a claim about a typical shop.

Run the same calculation by work center when a 5-axis cell, Swiss lathe or laser has different ownership and utilization. If you blend everything into one rate, keep the underlying rows so an idle machine does not make a busy machine look cheap. Revisit the denominator when quoting, setup, maintenance or inspection consumes more of the week than planned.

Illustrative rate worksheet
InputAssumptionArithmetic
Annual recoverable cost$312,000sum of stated cost lines
Staffed hours2,08052 × 40
Billable utilization70%2,080 × 0.70 = 1,456 h
Break-even rate$214.29/h$312,000 ÷ 1,456
Sell rate at 15% markup$246.43/h$214.29 × 1.15

Turn an hourly rate into a part price

For a small lot, charge setup and programming once per release, then multiply run minutes by the work-center rate. Suppose a 6061 bracket needs 90 minutes of programming and setup, 18 minutes of milling per part, and 4 minutes of inspection and deburr. At $246.43/hour, one piece carries 1.5 × $246.43 = $369.65 of setup and 22/60 × $246.43 = $90.36 of run time, before material and finish. Ten pieces spread setup to $36.97 each, so machine labor is $127.33 each before markup on purchased lines.

This is why an hourly rate cannot answer “what does one part cost?” by itself. Quantity, example part reuse, material minimums, tolerance checks and outside-process lot charges change the result. Show the buyer the scope and lead time, then keep the detailed cost model internal if that is your policy.

What to do next

Use the two published ranges as a conversation starter, label them with their source dates, and replace them with your own recovery calculation. Ask a prospective supplier whether programming, setup, inspection, tooling, material and freight are included. For a quote you issue, record the assumed rate, utilization and margin beside the routing so a later actual-versus-estimate review can correct the right input.

Illustrative rate assumptions

  • • Annual cost $312,000: labor 96,000; facility 72,000; machine 54,000; maintenance/tooling 28,000; software/quality 22,000; owner/office 40,000.
  • • Staffed hours 2,080/year; billable utilization 70%; sell markup 15%.
Rate result
MeasureValue
Billable hours1,456 h/year
Break-even$214.29/hour
Sell rate at 15% markup$246.43/hour

Sources and limits

Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.

  • Nox Metals lists $75–$125/hour for standard 3-axis milling, $100–$175/hour for 5-axis work and $60–$90/hour for CNC turning; its page says it was updated April 2026. — source (checked 2026-10-30)
  • NORAMARK says US shop rates run about $75–$150/hour for 3-axis milling and turning and $125–$250/hour for 5-axis and Swiss work. — source (checked 2026-10-30)

Price one of your own parts

Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.

Your STEP file or PDF drawing

Free. No account, no email. Priced at our default US rates until you set yours.