How do I quote aerospace parts (certs, FAI, DFARS material, special processes)?
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
Quote the machining route plus material traceability, FAI, certificates, approved special processes, inspection, and records; state only approvals you hold.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
The direct answer
A 7075 bracket can have $420 machining, $180 first-article work, $95 certificates and inspection, and $160 approved anodize. Show each deliverable and its owner instead of an unexplained surcharge.
Test the decision against the shop evidence in this example: A 7075 bracket can have $420 machining, $180 first-article work, $95 certificates and inspection, and $160 approved anodize.
Carry the measurable input from the worked case into the estimator's notes: A 7075 bracket can have $420 machining, $180 first-article work, $95 certificates and inspection, and $160 approved anodize.
Evidence from a shop floor
Aerospace quoting is a deliverables exercise: price the bracket, material trace, first article, special process, inspection record, and release authority as distinct work. The buyer should be able to see what happens at receiving, on the machine, at the approved processor, in quality review, and at shipment. For this aerospace route, a 7075 bracket is only the physical object. The commercial object also includes the heat certificate, ballooned drawing, FAI report, approved anodize, calibration evidence, nonconformance path, and customer witness points. Any missing item is an open assumption, not free work. An illustrative 7075 bracket route totals $1,175 direct for material, setup, machining, FAI, certificates, and anodize; at 25% markup it is $1,468.75. Freeze the drawing revision and quality deliverables matrix, then ask quality to approve the evidence list before production. Keep the first article and repeat-release routes separate.
Identify key characteristics, drawing notes, material temper, heat-lot certificate, FAI form, dimensional ballooning, approved anodizer, packaging, record retention, nonconformance approval, and the person who signs release. A repeat order may reuse a workholding and program, but a changed revision or processor can reopen first-article work. Receiving should verify the mill test report, heat, temper, country of melt, and condition. Programming should flag datum changes and tool access. Inspection should map every balloon, record calibrated equipment, and preserve the signed report. Outside anodize should have an approved source, thickness range, sealing requirement, and return paperwork. Packaging should protect machined edges and identify the lot. Quote these deliverables rather than saying aerospace is a surcharge. If a prime changes the clause, stop and route the change to quality. The price is ready when scope, evidence, ownership, and release authority are explicit.
The handoff is complete only when the owner can restate the route without losing a 7075 bracket can have $420 machining, $180 first-article work, $95 certificates and inspection, and $160 approved anodize.
Build the quote route
Freeze drawing revision, identify key characteristics, verify material and processor approvals, assign inspection evidence, and define release authority.
A useful review question is whether the current RFQ still matches this route: freeze drawing revision, identify key characteristics, verify material and processor approvals, assign inspection evidence, and define release authority.
The next estimator should be able to challenge the assumption behind this route: freeze drawing revision, identify key characteristics, verify material and processor approvals, assign inspection evidence, and define release authority.
Use the source notes to date the assumption and record why this route was selected: freeze drawing revision, identify key characteristics, verify material and processor approvals, assign inspection evidence, and define release authority.
Release and learn
DFARS, export control, customer clauses, and source inspection can add obligations; route them to the responsible quality owner before acceptance.
If the buyer asks for a different outcome, explain the boundary in these terms: dfars, export control, customer clauses, and source inspection can add obligations; route them to the responsible quality owner before acceptance.
Before changing the total, verify whether the caveat applies: dfars, export control, customer clauses, and source inspection can add obligations; route them to the responsible quality owner before acceptance.
A customer-facing explanation should make the risk legible: dfars, export control, customer clauses, and source inspection can add obligations; route them to the responsible quality owner before acceptance.
Close the loop by noting the evidence that would make this estimate obsolete: dfars, export control, customer clauses, and source inspection can add obligations; route them to the responsible quality owner before acceptance.
Also check export classification, customer-furnished data, serialization, shelf life, shelf packaging, environmental controls, delegated inspection, calibration intervals, training records, and the return path for nonconforming hardware. Make each item a named deliverable with an owner and a due date. That checklist is what distinguishes an aerospace quote from a normal aluminum job. Confirm whether the buyer wants raw inspection data, a signed certificate of conformance, a first-article report, or all three. Put revision-controlled templates in the traveler, and do not let a production operator guess which form is current. For a first article, schedule customer review time and a correction loop; for a repeat release, confirm the approved baseline and do not silently reuse an obsolete inspection plan. A buyer may also require source inspection, delegated authority, controlled tooling, environmental storage, approved sub-tier review, or a customer witness point. Capture the request in writing, assign it to quality, and put its effort in the quote before the purchase order is accepted. Freeze the aerospace drawing revision and quality deliverables matrix before buying material or promising delivery.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Answers
Can I ship 10% more or fewer parts than ordered?
Only when the purchase order or customer has agreed a quantity tolerance; there is no universal right to ship ten percent extra or short.
Answers
Can I use Xometry or Protolabs instant quotes as a price check?
Use an instant quote as a dated comparison point after matching quantity, revision, finish, inspection, freight, and delivery scope; it is not a neutral market index.
Answers
Customer sent a STEP file but no drawing — what tolerance do I quote?
Use a written model-only default only when the customer accepts it; a practical example is to model with ±0.005 inch unless a drawing states otherwise, while calling out material, finish, threads, and inspection as open.
Answers
Customers make us re-enter quotes in their supplier portals — how do other shops handle it?
Treat portal re-entry as measurable quote administration: export the approved quote, time the work, and decide whether the effort is included or charged.