Should I re-quote a repeat order or hold the old price?

Your part priced in about 90 seconds, no account.

Re-quote when revision, material, outside work, quantity, capacity, or delivery changed; reuse paid setup and workholding only when the route remains valid.

See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.

The direct answer

A repeat 50-piece order can reuse a proven program, but a 6061 supplier increase and a new anodizer lead require updated lines. Compare old and new assumptions side by side.

Test the decision against the shop evidence in this example: A repeat 50-piece order can reuse a proven program, but a 6061 supplier increase and a new anodizer lead require updated lines.

Carry the measurable input from the worked case into the estimator's notes: A repeat 50-piece order can reuse a proven program, but a 6061 supplier increase and a new anodizer lead require updated lines.

Evidence from a shop floor

If material rises $0.90 per part and a $120 finish is spread over ten, the direct increase is $21 each; with 30% markup the visible change is $27.30 each. Put the old and new scope side by side and explain every changed line rather than applying an automatic repeat discount.

Keep the commercial decision tied to the evidence, including a repeat 50-piece order can reuse a proven program, but a 6061 supplier increase and a new anodizer lead require updated lines.

The handoff is complete only when the owner can restate the route without losing a repeat 50-piece order can reuse a proven program, but a 6061 supplier increase and a new anodizer lead require updated lines.

Build the quote route

Check revision, actual cycle, setup reuse, supplier quotes, quantity break, capacity, inspection, and promised date.

A useful review question is whether the current RFQ still matches this route: check revision, actual cycle, setup reuse, supplier quotes, quantity break, capacity, inspection, and promised date.

The next estimator should be able to challenge the assumption behind this route: check revision, actual cycle, setup reuse, supplier quotes, quantity break, capacity, inspection, and promised date.

Use the source notes to date the assumption and record why this route was selected: check revision, actual cycle, setup reuse, supplier quotes, quantity break, capacity, inspection, and promised date.

Release and learn

Never carry an old price just because the part number is unchanged; document the unchanged evidence.

If the buyer asks for a different outcome, explain the boundary in these terms: never carry an old price just because the part number is unchanged; document the unchanged evidence.

Before changing the total, verify whether the caveat applies: never carry an old price just because the part number is unchanged; document the unchanged evidence.

A customer-facing explanation should make the risk legible: never carry an old price just because the part number is unchanged; document the unchanged evidence.

Close the loop by noting the evidence that would make this estimate obsolete: never carry an old price just because the part number is unchanged; document the unchanged evidence.

Keep the commercial decision tied to the evidence, including a repeat 50-piece order can reuse a proven program, but a 6061 supplier increase and a new anodizer lead require updated lines.

Price one of your own parts

Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.

Your STEP file or PDF drawing

Free. No account, no email. Priced at our default US rates until you set yours.