How do I handle steel and aluminum tariffs in my quotes?
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
Check the current official rule and your supplier invoice, then show any tariff or surcharge as a dated, documented material line.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
The direct answer
If a supplier invoice adds $18 to a 6061 billet, show the base material, surcharge basis, date, and whether the line is pass-through.
Test the decision against the shop evidence in this example: If a supplier invoice adds $18 to a 6061 billet, show the base material, surcharge basis, date, and whether the line is pass-through.
Carry the measurable input from the worked case into the estimator's notes: If a supplier invoice adds $18 to a 6061 billet, show the base material, surcharge basis, date, and whether the line is pass-through.
Evidence from a shop floor
For 100 pounds at $2.40/lb, a stated 25% tariff allowance is $60 direct; with 20% material markup that allowance is $72. Verify origin, product form, and exclusions on the quote date; never apply a remembered percentage universally.
Keep the commercial decision tied to the evidence, including if a supplier invoice adds $18 to a 6061 billet, show the base material, surcharge basis, date, and whether the line is pass-through.
The handoff is complete only when the owner can restate the route without losing if a supplier invoice adds $18 to a 6061 billet, show the base material, surcharge basis, date, and whether the line is pass-through.
Build the quote route
Record country of origin, invoice evidence, applicable rule, validity, and what happens if the rule changes before shipment.
A useful review question is whether the current RFQ still matches this route: record country of origin, invoice evidence, applicable rule, validity, and what happens if the rule changes before shipment.
The next estimator should be able to challenge the assumption behind this route: record country of origin, invoice evidence, applicable rule, validity, and what happens if the rule changes before shipment.
Use the source notes to date the assumption and record why this route was selected: record country of origin, invoice evidence, applicable rule, validity, and what happens if the rule changes before shipment.
Release and learn
Tariffs and exemptions change; confirm the current requirement instead of relying on an old percentage.
If the buyer asks for a different outcome, explain the boundary in these terms: tariffs and exemptions change; confirm the current requirement instead of relying on an old percentage.
Before changing the total, verify whether the caveat applies: tariffs and exemptions change; confirm the current requirement instead of relying on an old percentage.
A customer-facing explanation should make the risk legible: tariffs and exemptions change; confirm the current requirement instead of relying on an old percentage.
Close the loop by noting the evidence that would make this estimate obsolete: tariffs and exemptions change; confirm the current requirement instead of relying on an old percentage.
Keep the commercial decision tied to the evidence, including if a supplier invoice adds $18 to a 6061 billet, show the base material, surcharge basis, date, and whether the line is pass-through.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Answers
Can I ship 10% more or fewer parts than ordered?
Only when the purchase order or customer has agreed a quantity tolerance; there is no universal right to ship ten percent extra or short.
Answers
Can I use Xometry or Protolabs instant quotes as a price check?
Use an instant quote as a dated comparison point after matching quantity, revision, finish, inspection, freight, and delivery scope; it is not a neutral market index.
Answers
Customer sent a STEP file but no drawing — what tolerance do I quote?
Use a written model-only default only when the customer accepts it; a practical example is to model with ±0.005 inch unless a drawing states otherwise, while calling out material, finish, threads, and inspection as open.
Answers
Customers make us re-enter quotes in their supplier portals — how do other shops handle it?
Treat portal re-entry as measurable quote administration: export the approved quote, time the work, and decide whether the effort is included or charged.