How can a small machine shop win more RFQs?
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
Reply with complete scope, a credible date, clear assumptions, and one useful alternate; do not trade away the margin required to deliver.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
The direct answer
A quote that states 10 pieces, 6061, inspection report, and ship date is easier to award than a lower number with no scope. Test one alternate and measure win reasons.
Test the decision against the shop evidence in this example: A quote that states 10 pieces, 6061, inspection report, and ship date is easier to award than a lower number with no scope.
Carry the measurable input from the worked case into the estimator's notes: A quote that states 10 pieces, 6061, inspection report, and ship date is easier to award than a lower number with no scope.
Evidence from a shop floor
Offering one bracket at $464.53 and a ten-piece pilot at $83.77 each gives a buyer a decision without an unexplained discount. Measure quote response time, win reason, lost reason, and actual margin for one month.
Keep the commercial decision tied to the evidence, including a quote that states 10 pieces, 6061, inspection report, and ship date is easier to award than a lower number with no scope.
The handoff is complete only when the owner can restate the route without losing a quote that states 10 pieces, 6061, inspection report, and ship date is easier to award than a lower number with no scope.
Build the quote route
Review completeness, route fit, delivery confidence, price scope, follow-up date, and loss reason after each decision.
A useful review question is whether the current RFQ still matches this route: review completeness, route fit, delivery confidence, price scope, follow-up date, and loss reason after each decision.
The next estimator should be able to challenge the assumption behind this route: review completeness, route fit, delivery confidence, price scope, follow-up date, and loss reason after each decision.
Use the source notes to date the assumption and record why this route was selected: review completeness, route fit, delivery confidence, price scope, follow-up date, and loss reason after each decision.
Release and learn
Win rate without margin and on-time delivery is a misleading score; track all three.
If the buyer asks for a different outcome, explain the boundary in these terms: win rate without margin and on-time delivery is a misleading score; track all three.
Before changing the total, verify whether the caveat applies: win rate without margin and on-time delivery is a misleading score; track all three.
A customer-facing explanation should make the risk legible: win rate without margin and on-time delivery is a misleading score; track all three.
Close the loop by noting the evidence that would make this estimate obsolete: win rate without margin and on-time delivery is a misleading score; track all three.
Keep the commercial decision tied to the evidence, including a quote that states 10 pieces, 6061, inspection report, and ship date is easier to award than a lower number with no scope.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Answers
Can I ship 10% more or fewer parts than ordered?
Only when the purchase order or customer has agreed a quantity tolerance; there is no universal right to ship ten percent extra or short.
Answers
Can I use Xometry or Protolabs instant quotes as a price check?
Use an instant quote as a dated comparison point after matching quantity, revision, finish, inspection, freight, and delivery scope; it is not a neutral market index.
Answers
Customer sent a STEP file but no drawing — what tolerance do I quote?
Use a written model-only default only when the customer accepts it; a practical example is to model with ±0.005 inch unless a drawing states otherwise, while calling out material, finish, threads, and inspection as open.
Answers
Customers make us re-enter quotes in their supplier portals — how do other shops handle it?
Treat portal re-entry as measurable quote administration: export the approved quote, time the work, and decide whether the effort is included or charged.