Cost guides · Updated 2026-10-30

How much does Type II anodizing cost per part?

Your part priced in about 90 seconds, no account.

Small anodize lots are governed by the finisher's lot minimum as much as by the per-piece charge. This engine example prices the same 6061 bracket with clear and black Type II anodize, showing the lot charge, piece input, quoted unit price, lot total, and added lead days at quantities 1, 10, and 100.

See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.

A lot minimum is a real line

The clear Type II row starts with a $125 lot input and a $3.50 per-part input. Black uses a different piece input and a fee in the US catalog. At quantity one, the lot minimum overwhelms the piece price; by 100 pieces, the same minimum is a smaller share of each part.

The CNC portion of the example is unchanged across finishes. That makes the outside-process effect easy to audit instead of mixing the finisher's charge into an unexplained markup.

  • Ask whether the finisher has a minimum invoice.
  • State color, thickness, and masking requirements.
  • Add freight and rack limits when they apply.

Finish timing changes the promise

The pricing model adds the catalog finish lead days to the machining route. A five-day outside process is not the same as five calendar days if the vendor batches work or the shop waits to accumulate a rack. Treat the lead number as working-day planning input and confirm it with the vendor at order time.

Do not quote anodize from a per-square-foot web number alone when a small lot minimum governs. Enter the actual vendor rule and show its date.

  • Separate machining completion from finish return.
  • Confirm masking and contact marks.
  • Keep the vendor quote attached to the job.

When black and clear are not interchangeable

Black anodize can carry a different piece price, surcharge, and cosmetic acceptance standard. Type II is also different from hardcoat Type III in thickness, hardness, and vendor handling. The table intentionally compares only the two Type II inputs named in the workholding.

If the customer asks for a different finish, add a new explicit finish line rather than editing the finished total by intuition. The same quantity-break arithmetic still applies.

  • Do not promise color match from a generic label.
  • Check whether threads and bores need masking.
  • Rerun after changing finish or quantity.

Use the result as an estimator's starting point

For this type ii anodizing cost per part for small batches example, an estimator can challenge every cnc milling plus type ii anodizing input. Replace this fictional geometry with the customer's STEP file or drawing, then replace the catalog stock price, work-center rate, setup minutes, and markup with the shop's current 3-axis vmc and outside anodizer values.

Keep the lot setup visible when you send this quote for type ii anodizing cost per part for small batches. Confirm stock form, material condition, tolerances, inspection, deburr, and outside-process timing before promising a ship date. If one of those inputs changes, rerun the calculation and show the buyer what moved.

  • Show both unit and lot totals.
  • Label illustrative values clearly.
  • Have the estimator review access, tooling, and first-piece risk.

Type II clear and black finish inputs carried through the pricing engine

  • • Material: Aluminum 6061-T6; the US catalog input is $9.50/lb and machinability 1.00 relative to 6061-T6.
  • • Process: CNC milling plus Type II anodizing; the pricing model includes CAM programming, 12 toolpaths, Mill, 3 setups, Deburr, Inspect and calculates the quantities shown.
  • • Geometry: 4 × 3 × 1 in; Fictional 4 × 3 × 1 in prismatic reference part. Two mill setups are inferred from the top and side features.
  • • Markup: 30% catalog default. Taxes, freight, customer-specific rates, and unlisted outside services are excluded.
  • • Every dollar and minute in the table is a reproducible example from the stated inputs, not a market average or supplier promise.
Type II clear and black finish inputs carried through the pricing engine
Outside processQuantityVendor lot inputVendor piece inputQuoted / partLot quoteLead days
Anodize Type II, clear1$125.00$3.50$627.03$627.0316
Anodize Type II, clear10$125.00$3.50$100.02$1000.2016
Anodize Type II, clear100$125.00$3.50$45.46$4546.0019
Anodize Type II, black1$125.00$4.25$646.53$646.5316
Anodize Type II, black10$125.00$4.25$101.97$1019.7016
Anodize Type II, black100$125.00$4.25$47.00$4700.0019

Sources and limits

Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.

  • The stock price input is taken from the US catalog, which records an Online Metals check on 2026-10-21. — source (checked 2026-10-21)
  • Finish inputs are catalog examples with dated vendor-rule notes; they are not a promise from a particular anodizer.

Questions

Is this a guaranteed 6061-t6 aluminum quote?

No. It is a transparent estimating example. Replace the example inputs with the customer's drawing, stock quote, current shop rates, and inspection or finish requirements.

Why does quantity change the unit price?

Setup and programming are lot costs. The pricing calculation spreads those costs across the stated quantity and keeps the per-part run time and material inputs visible.

Price one of your own parts

Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.

Your STEP file or PDF drawing

Free. No account, no email. Priced at our default US rates until you set yours.