Answers · Updated 2026-10-30
Should a machine shop charge for quotes on complex RFQs?
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
Keep routine price estimates in your selling budget, and offer a paid study when the buyer needs substantial work with a useful deliverable before you can quote production. Ask for agreement before starting. In the example below, a defined five-hour package review sells for $750 at an assumed $150 hourly rate. A conditional credit against a later order is possible, but that credit must appear in the manufacturing margin calculation.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
Example: a package needing a feasibility decision
Assume a buyer sends 40 line items for a small workholding assembly, including milled plates, turned locators and purchased hardware. Several drawings lack finished dimensions and the buyer wants a routing comparison before releasing the design. Instead of promising a firm price for all lines, offer a study covering ten representative manufactured parts, the supplied bill of materials and a consolidated list of questions.
Allow one hour for package triage, two hours for representative routings, one hour to obtain outside-process budget inputs and one hour for a written review with the buyer. Five hours at a $150 selling rate gives a $750 fee. Assume the shop's burdened engineering cost is $90 per hour: delivering the study costs $450 and leaves $300 before any other unallocated expense. The rates and workload are example assumptions, not claims about common fees.
| Deliverable | Hours | Fee at $150/hour |
|---|---|---|
| Package completeness and family map | 1 | $150 |
| Ten representative part routings | 2 | $300 |
| Outside-process budget review | 1 | $150 |
| Question list and buyer review | 1 | $150 |
| Total study | 5 | $750 |
Distinguish a sales estimate from a purchased deliverable
Reading a clear drawing, checking material and sending your part price usually produces something the shop needs to make a sale. A manufacturability report, reconstructed specification or comparison of several production routes can have separate value to the buyer. Define that value explicitly instead of charging the buyer because your internal spreadsheet is slow.
A large package alone does not prove that a fee is sensible. You might quote only the families that fit your equipment, ask for the buyer's shortlist, or supply a budget range pending missing information. Those options can preserve estimating capacity without selling an engineering service the buyer never requested. Track your own hours and conversion results before making a blanket policy.
Make any order credit affordable
Suppose the resulting production order is $15,000 and its separate manufacturing cost is $12,000. Without a credit, the combined study and production leave $15,750 − $12,450 = $3,300. A full $750 production credit reduces combined revenue to $15,000 and combined profit to $2,550. The engineering work still cost $450 even after its invoice was credited.
A smaller $375 credit would leave $2,925 combined profit. Choose the amount deliberately and define the qualifying order, deadline and minimum value. Avoid an unlimited credit against a tiny prototype order or a promise that follows unrelated future orders forever. Your cost model should show the net transaction, so sales does not celebrate a margin that the credit later removes.
Offer the scope in a form the buyer can approve
Example proposal: ‘We can provide a $750 feasibility review covering ten representative parts from package FA-8 revision C, a routing comparison and one consolidated question list. Includes one review meeting; excludes released design files, machine programs and firm pricing for unresolved drawings. Fee is due before the review starts. A $375 credit applies to one production PO of at least $15,000 for this package received within 60 days.’ The dollar and date thresholds are illustrative policy choices.
Start with the buyer's objective and ask whether the study answers it. If they only need a competitive manufacturing price, narrow the quotation scope or decline the unresolved lines. If they purchase the review, record the package revision, deliverable and time limit, then get written approval for extra work before exceeding them.
Sources and limits
Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.
- Study hours, selling and cost rates, manufacturing economics and credit conditions are worked assumptions. No industry custom or standard quoting fee is asserted.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Answers
A customer cancelled an order part-way through: what can I charge?
Charge for what you've spent and what you can't recover, stage by stage: material, programming and setup, machining done, finishing. A cancellation schedule on a 100-piece bracket order and the clause wording to put in your terms.
Answers
A customer compares your quote to Xometry's: how do you compete?
How to compare your price with a marketplace quote on the same basis, which jobs to stop chasing, and what a local shop can offer that an instant quote doesn't. With a priced 6061 bracket.
Answers
A customer wants a cost breakdown of your machine-shop quote
Decide what to disclose, protect confidential methods and still give the buyer a useful scope and price explanation.
Answers
A customer wants full material disclosure, RoHS or PFAS paperwork: what can a small machine shop sign?
What a job shop can truthfully sign on a RoHS, REACH, PFAS or full material disclosure form, what belongs to the mill and the finisher, a supplier request letter, and how to charge for the work.