Answers · Updated 2026-10-30
How do I charge for design help or engineering changes?
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
Sell requested engineering help as a defined service with an hourly rate or fixed scope, a spending limit, named deliverables and customer approval before production. For this example, three hours at an assumed $135 engineering selling rate makes a $405 estimate; a four-hour cap limits authorized work to $540. Keep the design-assistance line separate from programming and setup already included in the manufacturing quote.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
Example: moving a pocket away from a thin wall
Assume a customer wants 30 aluminum sensor housings, each 3 × 2 × 1 inches. The customer asks the shop to review a deep pocket near a mounting wall, propose a machining-friendly alternative and update the supplied CAD after the customer's engineer selects it. This is a purchased design-assistance task. Merely choosing a cutter or programming the approved geometry belongs in the manufacturing estimate instead.
Budget 0.75 hour for feature and workholding review, 1.25 hours for one proposed CAD change and 1.00 hour for checking the files and a customer review. Three hours at $135 gives $405. Authorize up to four hours, or $540, with billing for actual recorded time. At an assumed burdened engineering cost of $85 per hour, three hours cost $255 and leave $150 before other unallocated expenses. No rate here is an industry benchmark.
| Engineering activity | Estimated hours | Selling amount at $135/hour |
|---|---|---|
| Manufacturability and workholding review | 0.75 | $101.25 |
| One proposed CAD revision | 1.25 | $168.75 |
| Check and customer review | 1.00 | $135.00 |
| Estimated actual-time billing | 3.00 | $405.00 |
| Authorized maximum without another approval | 4.00 | $540.00 |
Define what the engineering line purchases
Name the incoming part and revision, the issue to investigate, the output file formats and the number of review cycles. A marked PDF recommendation, an edited STEP model and a native CAD assembly are different deliverables. Do not promise editable source files your shop cannot supply. State whether you will check only manufacturability or also perform calculations, testing or other specifically purchased work.
Separate the customer's functional decisions from the shop's proposed process improvement. Increasing a corner radius may simplify machining, but the customer must confirm mating clearances and product performance. Identify who is authorized to release the revised definition and what written approval you require. Commercial approval to spend engineering hours should not be mistaken for approval of the final geometry.
Quote downstream production changes separately
Suppose the customer accepts the revised pocket after the original machine program was already prepared. Assume an additional 1.5 programming hours at a $120 selling rate and a $90 workholding alteration. That adds $270 of manufacturing change charges beyond the $405 engineering example. If the original program had not been made yet, charging for replacing it would have no basis in this scenario.
Check work in process before promising that a change is cheap. Identify material already cut, parts that can be reworked, parts that cannot be salvaged, new inspection work and outside orders that must be changed. Reprice the remaining production scope at the released revision. Avoid billing the same CAD edit once as engineering assistance and again as a programming change unless those are genuinely separate tasks.
Get the scope approved, then control the hours
Example service line: ‘Manufacturability review and one proposed CAD revision for SH-30 revision A: estimated 3 hours at $135/hour, billed for actual time, not to exceed $540 without written approval. Includes one consolidated review and STEP/PDF deliverables. Customer retains responsibility for functional design approval. Manufacturing price and schedule will be reconfirmed after release.’ Have the responsibility and ownership wording reviewed for the actual agreement; it does not automatically override the customer's terms.
Record time against the engineering authorization and send a progress note before reaching the cap. If the customer adds another component or requests a second concept, estimate that addition before continuing. For the next request, offer the bounded service alongside the production quote so both parties can see what is included and what still requires a decision.
Sources and limits
Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.
- All hours, rates, costs, caps and change charges are illustrative. The proposed scope is a commercial example and does not determine intellectual-property ownership or contractual liability.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Answers
A customer cancelled an order part-way through: what can I charge?
Charge for what you've spent and what you can't recover, stage by stage: material, programming and setup, machining done, finishing. A cancellation schedule on a 100-piece bracket order and the clause wording to put in your terms.
Answers
A customer compares your quote to Xometry's: how do you compete?
How to compare your price with a marketplace quote on the same basis, which jobs to stop chasing, and what a local shop can offer that an instant quote doesn't. With a priced 6061 bracket.
Answers
A customer wants a cost breakdown of your machine-shop quote
Decide what to disclose, protect confidential methods and still give the buyer a useful scope and price explanation.
Answers
A customer wants full material disclosure, RoHS or PFAS paperwork: what can a small machine shop sign?
What a job shop can truthfully sign on a RoHS, REACH, PFAS or full material disclosure form, what belongs to the mill and the finisher, a supplier request letter, and how to charge for the work.