Should I fix or redraw a customer's prints before quoting?
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
Clarify errors before quoting a firm manufacturing scope; redraw only when a defined paid task or an internal planning sketch will help. Do not silently repair a customer's design. For the example below, rebuilding a simple bracket drawing takes 2 hours at an assumed $110 engineering rate, or $220. That is a separate approval item before a production quote, not free design responsibility buried in the part price.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
Example: a bracket whose hole locations cannot both be right
Assume a 6061-T6 mounting bracket is 4 inches long, 2 inches wide and 0.25 inch thick. Its print locates one hole center 0.50 inch from the left edge and another 0.50 inch from the right, but calls their spacing 3.25 inches. The edge dimensions imply 4 − 0.50 − 0.50 = 3.00 inches. A machinist can spot the conflict without knowing which dimension reflects the intended assembly.
Prepare a marked copy showing the two possible readings. For this illustrative review, allow 0.25 hour to list discrepancies, 1.25 hours to reconstruct the drawing after the customer answers, and 0.50 hour to check the new document against the approved response. At $110 per hour the total is $220. Those hours cover one simple part and one review cycle; multiple sheets, mating components or missing tolerance decisions require another estimate.
| Task | Hours | Charge at $110/hour |
|---|---|---|
| Discrepancy list | 0.25 | $27.50 |
| Reconstruct after customer clarification | 1.25 | $137.50 |
| Independent document check | 0.50 | $55.00 |
| Total before production estimating | 2.00 | $220.00 |
Decide what document you are actually making
An internal operation sketch can show work offsets, soft-jaw locations or inspection points while remaining subordinate to the customer's released definition. Label it with the source part number and revision, identify it as a manufacturing aid, and verify every copied requirement. Do not give it the appearance of an approved replacement customer drawing.
A corrected product drawing is different. Changing hole spacing, selecting an unspecified fit or relaxing a surface requirement changes what the customer is buying. Obtain approval from the person authorized by that customer to release the definition. A buyer's request to make it work may be a useful conversation starter, but it leaves unresolved which dimensions the inspector will later accept.
ASME's public description of Y14.35 says it covers revision practices and methods for identifying and recording revisions. That supports keeping changes traceable; the description does not establish who owns this customer's design or give a supplier authority to change it. The contract and customer's release process still need to answer those questions.
Offer a clarification and a bounded paid scope
Suggested RFQ response: ‘Drawing BR-42 revision B gives 3.25-inch hole spacing, while the edge dimensions produce 3.00 inches. Please confirm the controlling dimensions and issue a corrected revision. We can instead prepare a proposed replacement drawing for your review for $220, covering one part and one consolidated review cycle. No manufacturing release is included until you approve the final definition.’
If the buyer needs a budget immediately, provide separately labeled alternatives with their assumptions and say neither releases production. Do not hide an unresolved design decision in a general tolerance note. State whether the engineering fee remains payable if the manufacturing order goes elsewhere, and identify the file formats the fee buys.
Release the right files to the floor
After approval, retain the incoming print, your discrepancy list, the authorized response and the released revision. Replace obsolete copies in the traveler, programming folder and inspection package together. Check the model too: repairing a PDF while programming from an older STEP file recreates the original ambiguity.
The next action is a short question list, not a full unpaid redraw. Ask the customer to resolve functional dimensions first; then estimate the documentation work that remains. Keep dimensional approval separate from commercial approval so a PO for drawing assistance cannot accidentally become permission to cut material to an unfinished design.
Sources and limits
Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.
- ASME describes Y14.35 as covering revision practices and identification and recording of revisions; this page uses only the public scope description. — source (checked 2026-10-30)
- The bracket conflict, engineering hours and selling rate are illustrative assumptions. Approval wording is a proposed workflow, not a ruling about contractual design responsibility.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Answers
A customer cancelled an order part-way through: what can I charge?
Charge for what you've spent and what you can't recover, stage by stage: material, programming and setup, machining done, finishing. A cancellation schedule on a 100-piece bracket order and the clause wording to put in your terms.
Answers
A customer compares your quote to Xometry's: how do you compete?
How to compare your price with a marketplace quote on the same basis, which jobs to stop chasing, and what a local shop can offer that an instant quote doesn't. With a priced 6061 bracket.
Answers
A customer wants a cost breakdown of your machine-shop quote
Decide what to disclose, protect confidential methods and still give the buyer a useful scope and price explanation.
Answers
A customer wants full material disclosure, RoHS or PFAS paperwork: what can a small machine shop sign?
What a job shop can truthfully sign on a RoHS, REACH, PFAS or full material disclosure form, what belongs to the mill and the finisher, a supplier request letter, and how to charge for the work.