Maybe. DDTC says a person engaged in the United States in the business of manufacturing defense articles, exporting or temporarily importing them, or furnishing defense services generally must register under ITAR §122.1, subject to exemptions. Registration is not an export license and does not by itself authorize a transfer. A shop quoting a defense part should classify the item and activity with the customer and qualified counsel before deciding. Worked example: a $300 filing and compliance allowance in an internal plan is an assumption, not a DDTC fee or a published cost.

See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.

Start with the activity, not the customer’s logo

A defense customer does not automatically make every commercial part ITAR-controlled, and a domestic job can still involve a defense article or technical data. Ask whether the part or drawing is on the US Munitions List, whether you are manufacturing or furnishing a defense service, whether you will export or temporarily import anything, and whether an exemption applies. The customer’s contract and classification answer those questions; “for the military” is not enough.

DDTC’s registration guidance says registration is generally a precondition to a license or approval, but registration itself grants no export or import rights. Keep registration, classification, license or exemption, US-person access and subcontractor authorization as separate checklist items.

Questions before accepting the RFQ
QuestionWhy it matters
What is the item?Defense article, commercial item or unresolved classification
What data arrives?Technical data may be controlled even without a physical export
What activity will we perform?Manufacturing, export, temporary import and defense service tests differ
Who will access it?US-person and authorized-vendor rules can constrain the route
What authorization applies?Registration is not the same as a license or exemption

Separate registration from the quote

If classification and authorization are confirmed, price the physical work plus the controls your program requires. An illustrative one-off has $120 material, 1.5 machining hours at $125/hour ($187.50), $60 inspection and $150 controlled-data administration. Internal cost is $517.50. A 20% markup gives $621.00. The $150 is a planning allowance for your own review; it is not a DDTC charge and should be replaced with your actual compliance cost.

Do not add a “registered” badge to a quote as if it promises approval. State the authorization or customer instruction you are relying on, the data covered, the approved outside processes and the quote’s exclusions.

Ask for help where the rule is fact-specific

The ITAR definitions, USML categories and exemptions are fact-dependent. A traditional repair may be treated differently from manufacturing a new defense article; a part’s classification may be controlled by the prime’s technical-data determination. Ask DDTC for an advisory route or use qualified export counsel when the answer affects an authorization. Do not copy a forum answer into a compliance procedure.

If your shop is not ready to control the data and people, decline or return the RFQ without forwarding the files. A decision log that says “classification and authorization not confirmed” is more defensible than an estimate based on an assumption.

What to do next

Make the RFQ owner record classification, registration status, authorization, people, systems and suppliers before the estimator calculates a price. Revisit the decision when the revision, customer, destination or outside process changes.

Illustrative defense-job assumptions

  • • Material $120; 1.5 machining hours at $125/hour; inspection $60.
  • • Controlled-data administration allowance $150; 20% markup. The allowance is not a government fee.
Example arithmetic
LineAmount
Material$120.00
Machining$187.50
Inspection$60.00
Administration allowance$150.00
Internal cost$517.50
Price at 20% markup$621.00

Sources and limits

Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.

  • DDTC says persons engaged in the United States in the business of manufacturing defense articles, exporting or temporarily importing them, or furnishing defense services must register under ITAR Parts 122 and 129, subject to exemptions; registration does not grant export rights. — source (checked 2026-10-30)
  • DDTC’s consolidated guidance explains that the registration obligation depends on whether the activity is manufacturing a defense article and that not every gunsmithing or repair activity qualifies. — source (checked 2026-10-30)

Price one of your own parts

Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.

Your STEP file or PDF drawing

Free. No account, no email. Priced at our default US rates until you set yours.