What numbers should a small job shop track every week?
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
Track quote turnaround, decided quote win rate, quoted versus actual hours, on-time delivery, spindle utilization and margin on completed jobs. Start with one sheet and consistent definitions. In the illustrative week below, 40% of decided quotes were won, but jobs used 20% more hours than estimated and produced a 24% job margin. More wins would not fix that estimating problem; checking the missing hours would.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
A worked weekly scorecard
These are invented operating inputs for a small milling shop, not industry targets. Five complete RFQs took 2, 4, 6, 10 and 18 business hours to quote, giving a median of 6 hours. Separately, ten older quotes received a decision this week: four wins and six losses. The other open quotes stay out of that denominator until decided.
Assume the completed jobs had 100 quoted production hours and 120 recorded hours. Nine of ten order lines due this week shipped complete by the acknowledged date. Two mills were staffed for 40 hours each and recorded 52 combined spindle hours. Completed jobs sold for $25,000 against $19,000 of consistently allocated job cost. Exclude sales tax and use the same cost categories every week.
| Measure | Calculation | This week |
|---|---|---|
| Quote turnaround | Median of 2, 4, 6, 10, 18 business hours | 6 business hours |
| Decided win rate | 4 wins / (4 wins + 6 losses) | 40% |
| Actual-hours overrun | (120 actual − 100 quoted) / 100 quoted | +20% |
| On-time delivery | 9 complete on-time lines / 10 lines due | 90% |
| Spindle utilization | 52 spindle hours / 80 staffed machine hours | 65% |
| Completed-job margin | ($25,000 − $19,000) / $25,000 | 24% |
Define the clocks before comparing weeks
For quote speed, record both RFQ arrival and the point when the package became complete. Report buyer waiting time separately from estimating time so unanswered questions remain visible. Use business hours for the internal clock and specify your working calendar. A Friday afternoon RFQ should not quietly count weekend hours in one estimator's spreadsheet and exclude them in another's.
Track wins by count and by quoted dollars. Four small wins can hide a lost package that would have filled the month. Mark no-bids separately from customer losses, and record the loss reason when the buyer supplies one. A change in the mix of repeat work and difficult prototypes can move win rate without indicating a change in sales performance.
Delivery needs a stable promise date. Save the original acknowledged date alongside any agreed revision; otherwise moving dates can make late work disappear. Define whether a partial shipment counts. For the example, a line is on time only when its whole required quantity ships, and each line receives one vote regardless of its dollar value.
Collect the inputs without buying another system
Use a quote tab with RFQ identifier, complete-package timestamp, sent timestamp, quoted dollars, decision and reason. Use a job tab with promised date, shipped date, quoted setup and run hours, actual setup and run hours, sales, material, outside services and burdened conversion cost. A machine tab needs staffed hours and spindle-counter readings. Avoid putting unattended overnight hours over a daytime-only denominator; expand the defined available hours when your operating schedule changes.
Reconcile time tickets before judging the estimator. Setup, deburring, inspection and rework should have their own entries; their disappearance into an overhead bucket makes quoted versus actual run time misleading. A burdened hourly cost already containing overhead should not receive the same overhead allocation again. The 24% figure is a job margin under the stated cost model, not a claim about cash flow or company net profit.
What to do at the next weekly meeting
Pick one completed job behind the 20-hour overrun and trace the difference. If a second setup was omitted, update that routing before another quote leaves. If the additional hours were an approved customer change, separate them from estimating error and check that they were billed. Give one person the correction and a due date.
Keep the first several weekly records as your own baseline. Discuss changes with their job mix and denominator rather than adopting an unsupported universal target. A busier spindle can accompany falling margin when the shop wins underpriced work; the scorecard becomes useful when the six numbers explain one another.
Sources and limits
Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.
- All operating results are calculated from the fictional weekly records shown. No survey average or industry performance target is asserted.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Answers
How long should it take to quote a machined part? A minutes-per-step budget
A planning budget for quote time by part complexity, where the minutes go, what a quote costs your shop at your hourly rate and win rate, and which steps are worth automating.
Answers
A customer cancelled an order part-way through: what can I charge?
Charge for what you've spent and what you can't recover, stage by stage: material, programming and setup, machining done, finishing. A cancellation schedule on a 100-piece bracket order and the clause wording to put in your terms.
Answers
A customer compares your quote to Xometry's: how do you compete?
How to compare your price with a marketplace quote on the same basis, which jobs to stop chasing, and what a local shop can offer that an instant quote doesn't. With a priced 6061 bracket.
Answers
A customer wants a cost breakdown of your machine-shop quote
Decide what to disclose, protect confidential methods and still give the buyer a useful scope and price explanation.