Calculators · Updated 2026-10-30

Recover overhead from the hours you can sell

Your part priced in about 90 seconds, no account.

The example’s $222,000 annual overhead pool costs $44.40 per billed hour when 5,000 of 10,000 available hours are sold. At 65% utilization it is $34.15; at 80% it is $27.75. These are allocations from the same expense pool, not market shop rates.

See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.

Indirect cost per billable shop hour

These costs are annual examples. Exclude direct machine ownership, direct wages and machine electricity if they are already recovered elsewhere. The denominator must cover the same machines or people whose overhead is in this pool.

Same annual pool, different sold-hour denominators
Billed shareBilled hoursOverhead per billed hour
50%5000$44.40
65%6500$34.15
80%8000$27.75

Define what belongs in the pool

Indirect payroll can include estimating, supervision and office work that is not assigned directly to jobs. Building occupancy, insurance, software and shared utilities may also belong here. Reconcile the list to your books instead of treating the example categories as an accounting standard. Direct machine ownership, direct operators and machine power belong outside this pool if the work-center calculation already recovers them. Put each expense in one place so the finished selling rate does not include rent or supervision twice.

Match the denominator to those expenses

Ten thousand available hours might represent five work centers staffed for 2,000 hours each. It should not be the capacity of one machine if the expense pool supports the whole shop. Billable utilization is the fraction of those hours that produces recovered job revenue under your chosen convention. If setup is billed and included in the available-hour base, count it consistently in sold hours. Do not divide the same overhead once by labor hours and again by machine hours unless you have deliberately split the expense pool.

Keep recovery separate from the selling decision

The calculator produces an overhead component only. Add the appropriate direct labor, machine ownership, consumables and return to build a full rate, then check it against real completed jobs. Lower utilization raises the amount each sold hour must recover, but increasing the rate cannot create demand by itself. Review unsold capacity, scheduling losses and avoidable expense alongside pricing. Annual totals also hide cash timing: a quarterly insurance bill or an equipment repair may still need a reserve even when the average hourly allocation looks adequate.

Price one of your own parts

Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.

Your STEP file or PDF drawing

Free. No account, no email. Priced at our default US rates until you set yours.