Calculators · Updated 2026-10-30
Read the finisher’s billing rule before dividing by quantity
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
For 25 example parts, a $125 additive lot charge plus $3.50 each is $212.50. Two $15 racks and a 12% fee make $271.60, or $10.86 per part. If that $125 is a minimum instead of an added charge, the same other inputs total $173.60. The calculator lets you select the actual rule.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
Batch finish invoice from supplier terms
Ask the finisher whether its lot figure is additive or a minimum. This model adds rack charges after the base, then applies the fee to both. Confirm the supplier’s actual fee basis, masking, color, coating specification, capacity, freight and tax before using the output.
| Item | Amount |
|---|---|
| Racks required | 2 |
| Base charge | $212.50 |
| Additional rack charges | $30.00 |
| Fees | $29.10 |
| Invoice total | $271.60 |
| Invoice cost per part | $10.86 |
Separate the coating scope from the price model
The Type II, Type III and chem-film buttons are illustrative invoice scenarios for different requested treatments. They are not interchangeable process specifications or supplier quotations. Confirm the drawing’s exact specification, revision, class, color, thickness and masking requirements before requesting a finisher’s price. An attractive piece price for the wrong scope is not a useful estimate. The model handles invoice arithmetic only and cannot predict coating performance, dimensional growth or whether a part can be racked as assumed.
Ask whether the lot figure is additive
Some offers state a lot charge plus piece cost; others invoice the greater of a minimum and the calculated piece total. Those are different rules, especially on small batches. The selector makes that choice explicit. Additional rack charges are added after the base, and the entered fee applies to both base and racks. If the vendor applies its fee to a different amount or imposes a separate invoice minimum, reproduce that policy in the supplier quote or adjust the inputs deliberately. Do not treat a percentage called environmental fee as universal across finishers.
Allocate the actual release and the extra work
Racks round up to complete loads using the entered parts-per-rack capacity. A large or delicate part may need more spacing, special contacts or multiple handling steps, so confirm the count with the processor. The displayed amount is outside invoice cost before the shop’s own handling markup, freight and tax. Add inspection, cert review, protected packaging and any required rework allowance separately when they are not included in the routing. Recalculate each released batch rather than spreading a lot minimum across an annual forecast that may never be ordered.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Calculators
Powder-coating cost calculator with oven batches
Estimate powder consumption, transfer loss, preparation labor, setup and whole oven batches, then apply markup and a lot minimum.
Calculators
Surface area calculator for finishing quotes
Calculate box, closed-cylinder and drilled-plate area, including hole walls, then apply a per-square-foot finish price and invoice minimum.
Calculators
Burdened labor cost per working hour calculator
Add employer payroll allowances, workers compensation and benefits, then spread paid wages over working hours after PTO and holidays.
Calculators
CNC machining time calculator with the published run formula
Estimate CNC milling time from removed stock, finished area, holes, and setups, with an example computed from QuotedPart's catalog formula.