Calculators · Updated 2026-10-30
Price the batch as well as the coated area
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
Ten example parts with four square feet each consume 0.57 pound of powder at 100 theoretical square feet per pound and 70% effective transfer. Including preparation labor, color setup and one oven batch, the modeled cost is $146.61. With 30% markup, the selling lot is $190.59, or $19.06 each.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
Powder, labor and oven batches
Coverage must come from the selected powder, specific gravity and film-thickness basis. The default 100 ft²/lb is an illustrative input. Transfer efficiency is applied once. Oven input covers incremental energy/operating cost; labor rate must not recover that same expense twice.
| Item | Result |
|---|---|
| Powder consumed/lot | 0.57 lb |
| Oven batches | 1 |
| Calculated cost/lot | $146.61 |
| Selling price/lot after minimum | $190.59 |
| Selling price/part | $19.06 |
Use coverage for the specified film
The coverage input must match the selected powder’s specific gravity and target film thickness. The default 100 square feet per pound is an example, not a published product yield. Effective transfer efficiency accounts for the process’s retained powder under your own recovery convention; do not subtract the same loss twice. Reclaim, color changes, part shape and required finish quality can change the real consumption. Enter coated surface area, including edges and accessible internal walls, rather than using only the footprint seen on a drawing.
Count the labor and the oven constraint
The six minutes per part can include the measured preparation, hanging, masking, spraying and unloading scope you choose. Forty-five setup minutes occur once per lot. Oven cost is charged by whole batches, so crossing the entered twenty-part capacity adds another batch even if the extra part is small. Capacity depends on rack spacing, airflow, part mass and the required cure schedule; the calculator cannot validate a cure or decide whether unlike parts can share a load. Use a proven batch plan before issuing a firm price.
Apply the commercial floor at the end
Calculated cost receives the selected markup, then the selling lot is raised to the minimum if necessary. The minimum is a selling charge, not another cost added to the batch. If you are buying outside processing, the supplier’s actual invoice rule takes priority over this in-house model. Add blasting, chemical pretreatment, stripping, testing, special packaging and freight if they are required and absent from the entered labor or batch inputs. Confirm color, texture, masking and acceptance criteria before treating a per-area estimate as a complete finishing offer.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Calculators
Anodizing batch cost and rack calculator
Apply a supplier's lot-charge or minimum rule, piece cost, rack capacity and fee to the actual batch quantity.
Calculators
Surface area calculator for finishing quotes
Calculate box, closed-cylinder and drilled-plate area, including hole walls, then apply a per-square-foot finish price and invoice minimum.
Calculators
Burdened labor cost per working hour calculator
Add employer payroll allowances, workers compensation and benefits, then spread paid wages over working hours after PTO and holidays.
Calculators
CNC machining time calculator with the published run formula
Estimate CNC milling time from removed stock, finished area, holes, and setups, with an example computed from QuotedPart's catalog formula.