Cost guides · Updated 2026-10-30
How much does a machined aluminum bracket cost?
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
This 4 × 3 × 1-inch aluminum mounting bracket prices at $552.51 for one, $91.26 each at ten and $43.29 each at 100. The example includes two orientations, four through holes, two side taps, a pocket and clear anodize. Setup and the anodizer's lot minimum explain much of the first-piece premium.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
Download and use
The bracket behind the estimate
Start from 1.125-inch 6061-T6 plate and finish to a 4 × 3 × 1-inch envelope. Four quarter-inch mounting holes pass through the top. Two 1/4-20 side holes are drilled 0.65 inch deep, requiring access after the top work. A 2 × 1.25 × 0.35-inch pocket has 0.125-inch internal corner radii. General dimensional tolerance is ±0.005 inch; there is no positional tolerance or CMM requirement.
This is a fictional reference design, not a customer's part. Its dimension schedule is downloadable so another estimator can reproduce the input. A real bracket with a thin upright, a curved profile or a bolted assembly could need a different stock blank and workholding. Do not scale its price purely by outside dimensions.
| Qty | Setup min/lot | Run min/part at qty | Stock | Setup | Machine/labor | Outside | Markup + floor | Sell/part |
|---|---|---|---|---|---|---|---|---|
| 1 | 155.5 | 12.80 | $45.00 | $236.88 | $18.13 | $125.00 | $127.50 | $552.51 |
| 10 | 155.5 | 12.80 | $15.88 | $23.69 | $18.13 | $12.50 | $21.06 | $91.26 |
| 100 | 155.5 | 12.80 | $9.49 | $2.37 | $18.15 | $3.30 | $9.99 | $43.29 |
Follow the routing before judging the price
Programming and initial setup are lot costs. Milling and handling repeat on every piece. The table separates those contributions from stock and outside finishing. The routing below shows the center rates and minutes used before the pricing model's quantity-related run reduction. That reduction is an estimating assumption, not a promise that every repeat takes less time.
Top features and side holes justify a second orientation, but the example assumes ordinary workholding rather than a dedicated production setup. A custom plate, soft jaws or a difficult datum relationship would add money before the first part. Four ordinary mounting holes also cost less to verify than four holes tied to a tight positional tolerance.
| Operation | Rate/h | Setup min/lot | Run min/part | Other lot | Other/part |
|---|---|---|---|---|---|
| CAM programming, 10 toolpaths | $95.00 | 65 | 0 | $0.00 | $0.00 |
| Mill, 2 setups | $95.00 | 67.5 | 9.2 | $0.00 | $0.00 |
| Deburr | $55.00 | 5 | 2.8 | $0.00 | $0.00 |
| Inspect | $75.00 | 18 | 0.8 | $0.00 | $0.00 |
Anodize changes a one-piece order
Clear Type II anodize uses a $125 lot minimum and a $3.50 size-scaled piece allowance, with a $0.55 piece floor. The minimum is compared with the piece total; it is not added on top. The finishing charge gets the same 30% shop markup as the rest of this example. Freight to the anodizer and special masking are excluded.
DMF publishes a $125 Type II lot minimum and a $0.55 piece minimum, checked October 30, 2026. Those support the minimum structure, not the complete example piece price or a promised delivery. Confirm whether threads need masking, whether rack marks are acceptable and whether the cosmetic face needs extra handling.
If the buyer needs only a functional prototype, quote an uncoated alternative with the specification clearly changed. For a repeat production order, keep the drawing revision, saved program and workholding information together. That gives a defensible way to reduce repeat setup while retaining first-piece verification.
Bracket estimate assumptions
- • 4 × 3 × 1 in finished; 1.125 in plate; pocket 2 × 1.25 × 0.35 in, R0.125; four Ø0.25 through holes; two side 1/4-20 taps with Ø0.201 drill, 0.65 in deep; ±0.005 in.
- • 6061 $9.50/lb small-lot, $4.50/lb volume input; engine stock allowances and learning. Two setups explicitly selected by estimator. VMC/CAM $95/h, bench $55/h, inspection $75/h; generated routing shown.
- • 30% markup, automatic markup rules disabled, $65 line minimum. Clear anodize only; no tax, freight, certs, tooling charge or expedite.
| Qty | Setup min/lot | Run min/part at qty | Stock | Setup | Machine/labor | Outside | Markup + floor | Sell/part |
|---|---|---|---|---|---|---|---|---|
| 1 | 155.5 | 12.80 | $45.00 | $236.88 | $18.13 | $125.00 | $127.50 | $552.51 |
| 10 | 155.5 | 12.80 | $15.88 | $23.69 | $18.13 | $12.50 | $21.06 | $91.26 |
| 100 | 155.5 | 12.80 | $9.49 | $2.37 | $18.15 | $3.30 | $9.99 | $43.29 |
Sources and limits
Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.
- DMF lists a $125 Type II minimum lot and $0.55 minimum piece charge. — source (checked 2026-10-30)
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Cost guides
6061 versus 7075 machining cost at 1, 10, and 100 parts
Price the same CNC-milled reference part in 6061-T6 and 7075-T6 with material, cycle-time, setup, and quantity effects separated.
Cost guides
6061-T6 aluminum CNC milling cost at 1, 10, 100, and 1,000 parts
A worked 6061-T6 aluminum 3-axis milling estimate with engine-computed setup, cycle, material, quantity-break, and lead-time assumptions.
Cost guides
Machined aluminum enclosure versus sheet-metal enclosure cost
A matched 6 by 4 by 2 inch open enclosure body compares pocketed 6061 with formed and corner-welded 5052 at three quantities.
Cost guides
Outside processing cost: anodize, plating, and heat treat lots
See how outside-process lot charges and piece inputs change a CNC part price at 1, 10, and 100 pieces.