Find the estimating queue before it becomes silence

Your part priced in about 90 seconds, no account.

Fifty RFQs at 45 minutes each require 37.5 estimating hours a week. With only thirty hours available, the team can finish forty whole RFQs and has ten above capacity. A chosen 25-minute scenario would require 20.83 hours and release 16.67 hours; that is scenario arithmetic, not a promised software result.

See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.

Weekly estimating load and a chosen scenario

Minutes should include review and correspondence. Work exceeding capacity is a queue or unquoted opportunity, not proven lost sales. The contribution scenario assumes those RFQs would otherwise go unanswered and uses your chosen win rate; it does not estimate a causal response-time effect.

Capacity arithmetic, not a promised productivity or sales result
MeasureResult
Current estimating hours/week37.5
Current estimating cost/week$2,250.00
Scenario hours/week20.83
Hours released/week16.67
Whole RFQs current capacity can handle40
RFQs above that capacity10
Hypothetical missed contribution/week$800.00

Measure the complete estimating touch

Include file review, missing-information questions, supplier pricing, routing, internal approval and preparing the issued offer. Timing only the arithmetic makes the apparent bottleneck disappear while the inbox still grows. Separate unusually large assemblies from routine repeat parts if one average conceals different workloads. Available estimating hours should exclude time the owner spends on the floor, purchasing and customer support. A forty-hour workweek does not automatically provide forty hours of focused quotation work.

Use the scenario as a testable assumption

Enter a proposed future time per RFQ based on a workflow change you can observe, such as a complete intake package or a reusable routing for repeat work. A shorter time must still include technical and commercial review. The calculator shows released hours at the same incoming volume; it does not decide whether the team uses them for more quotes, faster response or another job. A negative released-hours value is valid when the proposed process takes longer. Track a comparable sample before and after making a productivity claim.

Keep opportunity dollars hypothetical

The optional contribution result multiplies above-capacity RFQs by your assumed win fraction and contribution per won release. In the defaults, ten unanswered opportunities at 20% and $400 contribution produce $800 a week. This assumes those requests would otherwise receive no quote; a temporary queue may still be answered later, so the amount is not measured lost profit. There is no causal claim that a particular response speed creates a particular win rate. Use the quote log to distinguish incomplete packages, internal waiting and actual no-bids before changing staffing.

Price one of your own parts

Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.

Your STEP file or PDF drawing

Free. No account, no email. Priced at our default US rates until you set yours.