A machine pays back from added contribution, not from its hourly selling rate alone. The example sells 100 additional hours a month at $110, incurs $55 incremental cost per hour and adds $1,000 monthly fixed cost: $4,500 monthly operating cash at full ramp, before financing. The calculator includes a six-month ramp and a separate loan schedule.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
Machine cash recovery with a utilization ramp
Sold hours ramp linearly: month 1 is 1/ramp of full hours. Financing covers only purchase price. No taxes, resale, working-capital timing or discounting. Variable cost must include extra labor, tooling and power. Existing work moved from another machine is not incremental revenue.
| Measure | Result |
|---|---|
| Initial cash paid | $50,000.00 |
| Monthly loan payment | $2,376.14 |
| Operating cash/month at full ramp, before debt | $4,500.00 |
| Initial-cash recovery after debt payments | 31 months |
| Full-investment payback before financing | 41 months |
Count revenue the shop would otherwise miss
Hours transferred from an existing machine are not automatically new sales. Enter work that the added capacity enables, or quantify the old capacity it frees for other sold work. Variable cost should include the additional operator effort, tooling, power and outsourced work needed for those hours. Fixed costs cover the extra insurance, software, service or floor-space commitment. The two preset buttons are hypothetical purchase cases, not equipment quotations or a recommendation to buy either machine.
Read the two recovery dates separately
Full-investment payback accumulates operating cash against purchase plus installation cost without financing. Initial-cash recovery begins with down payment plus installation and subtracts loan payments each month until the loan term ends. The payment uses a fixed monthly interest rate and level payments; zero interest spreads principal evenly over the term. These are different questions, so a financed scenario can recover its initial cash sooner while still owing principal. The model checks end-of-month balances for up to 600 months and reports when recovery does not occur within that horizon.
Stress the assumptions before committing cash
During a six-month ramp, month one sells one-sixth of the full hours and month six reaches the full rate. Fixed operating costs start immediately. Change hours, ramp and contribution to test delays in training, programming or customer approval. No income taxes, depreciation tax effects, resale proceeds, working-capital timing or discount rate are included, so the result is an undiscounted planning scenario rather than a complete investment valuation. Review the financing contract and your actual backlog separately before making a purchase decision.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Calculators
Estimating capacity and weekly RFQ load calculator
Compare incoming RFQs with available estimating hours, cost the current workload and model a chosen time-per-quote scenario.
Calculators
Machine billed utilization and break-even calculator
Compare sold hours with available hours and see the fixed-cost burden at actual, 50%, 65% and 80% billed utilization.
Calculators
Machine hourly burden calculator
Build a machine-specific cost per billed hour from ownership, labor, utilization, space, power and upkeep, with six editable presets.
Calculators
Anodizing batch cost and rack calculator
Apply a supplier's lot-charge or minimum rule, piece cost, rack capacity and fee to the actual batch quantity.