Templates · Updated 2026-10-30

Agree on the revision’s cost before changing the job

Your part priced in about 90 seconds, no account.

Price a drawing change from the work it adds or removes, then record the revised total and date for approval. The filled example adds $400 of programming, setup, material and outside commitments, credits $100 of removed scope and changes a $2,000 order to $2,300. It does not charge already billed work twice.

See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.

Download and use

Freeze the old scope and the affected work

Record the original PO, accepted quote, drawing revision, release quantity, price and delivery basis. Identify the new drawing or instruction and which pieces are already programmed, cut, finished or shipped. The change affects only the agreed population; a revision on the next release may not require scrapping finished work from the current one. Put a hold or safe stopping instruction on affected operations while the authorized people decide the scope, and retain both document revisions.

Price incremental work and legitimate credits

The example adds $120 reprogramming, $180 re-setup, $75 committed material and $25 outside-process commitment. A $100 credit removes work no longer required, leaving a $300 net adjustment. Enter actual commitments and the contract’s agreed treatment rather than assuming every cost is recoverable. If the old order already invoiced a charge, reconcile it before including it again. Reusable stock or tooling may reduce the adjustment. A quantity change or expedite can use the same worksheet but requires its own clear scope and schedule assumptions.

Get approval of price and date together

Approval wording: Change [identifier] replaces [old scope] with [new scope] for [affected quantity/serials]. Net price adjustment is [amount]; revised order total is [total]. Revised [ship/completion] date is [date], subject to [specific conditions]. Authorized buyer [name/date] approves this change and [updated PO/reference]. Have your commercial process and counsel review the wording before use. Do not treat receipt of a new drawing as agreement to a new price, and do not promise the old delivery date until the changed routing has been checked.

Price one of your own parts

Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.

Your STEP file or PDF drawing

Free. No account, no email. Priced at our default US rates until you set yours.