Templates · Updated 2026-10-30
Make the price conditions visible before the PO
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
A useful validity clause names an expiration date and the quantity, revision and material basis it protects. A material clause explains when a new offer is needed. The four editable examples below are drafting prompts for counsel; they do not change an accepted PO or override an existing supply agreement.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
Download and use
Validity and stock availability
Example: This offer is valid through [date] for [quantity] pieces of [part/revision] in one release. Material availability and production capacity are confirmed at order acceptance. If you choose a thirty-day validity window, calculate and print its actual end date. Do not pair a firm fixed-price promise with an unexplained reservation to change price at any time; reconcile that conflict with the customer before accepting the order.
Example: Pricing uses supplier offer [reference/date] for [grade/form/size]. If that offer expires before order acceptance, we will request an updated material quote and submit any revised price for approval. For already accepted orders, material escalation follows [existing agreement/change process]. A supplier’s increase is evidence for a discussion, not automatic permission to invoice a different amount.
Quantity and drawing changes
Example: Unit pricing assumes [quantity] pieces manufactured in one lot. Changes to release size, part revision, inspection scope or approved processor require review and a revised offer before the changed work starts. Identify whether tooling and programming are separate NRE or included in the unit price. If a blanket order allows several releases, write the minimum release and setup policy explicitly instead of relying on the annual forecast to recover a first setup.
Lead time and acceptance
Example: Estimated production lead time is [duration] after written acceptance of a matching PO, receipt of complete approved files and [agreed deposit/customer material]. Shipment method and transit time are [basis]. Avoid stating both a fixed arrival date and an unconfirmed processor-dependent estimate. Review the buyer’s required date at acceptance and acknowledge what the shop can actually support. Keep the approved offer, customer changes and final acknowledgment together so production can identify the governing revision and delivery commitment.
Sources and limits
Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.
- New York UCC §2-207 illustrates why conflicting offer and acknowledgment terms require legal review rather than an assumption that the latest footer controls. — source (checked 2026-10-30)
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Templates
Machine shop quote terms and conditions template
An annotated drafting worksheet covering quote validity, material changes, quantities, tooling, FAI, payment, cancellation and liability.
Templates
Expedite fee calculator and policy wording
Build an expedite fee from incremental overtime, displaced-work cost, freight and vendor premiums, with approval wording for the quote.
Templates
Machine shop price-increase letter templates
Draft annual, material-driven and shop-rate increase notices with explicit effective dates and separate treatment of accepted orders.
Templates
Purchase order acknowledgment and discrepancy templates
Compare an incoming PO with the quote, then send a reviewed acknowledgment or a specific discrepancy request before releasing changed work.