Templates · Updated 2026-10-30
No-quote email templates for five shop decisions
Price one of your own parts: Drop a STEP model or PDF drawing — about 90 seconds, no account.
Your part priced in about 90 seconds, no account.
Decline an RFQ promptly by naming the constraint, identifying the part and revision, and offering a realistic next step. A clear no-quote lets the buyer keep sourcing without guessing.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
Download and use
Choose the real reason
Use capacity when you can make the part but cannot meet the requested release or delivery date. Use capability when the envelope, process or inspection equipment is outside your route. Material and tolerance problems deserve their own explanation because the buyer may be able to change the requirement. For a small order, offer a minimum lot charge or economic quantity only if you actually want the work. The text file below contains all five versions, ready to edit.
Copy a capacity response
Subject: No quote — [RFQ], [part], revision [rev] Hello [name], thank you for the RFQ for [quantity] pieces of [part/rev]. We cannot meet the requested [date] with our current schedule, so we will not submit a price for this release. If delivery can move to [date], please let us know and we can review capacity again. Thank you for including us. [Estimator / shop]
For capability, replace the middle sentence with: This part requires [process/envelope] that we cannot support in our current shop. For material, use: We do not have an approved source for [material/spec] for this release. For tolerance, use: We cannot commit to [feature/callout] with our current process and inspection method. These are statements about your own capability, not criticism of the drawing.
Keep the customer relationship useful
For a small order, write: Our minimum lot charge for this routing is [amount], which would put [quantity] pieces above your target. We are declining this release, but can review a larger batch or a revised scope. Do not imply an alternate material, tolerance or delivery date is approved. If you refer another shop, confirm that shop wants the introduction and avoid promising its capacity. Log the no-quote reason separately from a lost price bid so the next win-rate review does not confuse capability gaps with pricing failures.
Sources and limits
Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.
- All dollar amounts and operating inputs on this page are editable examples, not market averages or supplier offers.
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Templates
Machine shop estimating spreadsheet with routing and quantity breaks
Build a machining estimate by pricing each operation separately: setup once per lot, run time per part, stock by purchased weight, and outside processing by lot plus piece.
Templates
Sheet-metal quote workbook with quantity breaks
A filled fabrication estimate with rectangular sheet yield, catalog laser time, brake setup, hardware, welding and finish at three release quantities.
Templates
Certificate of conformance template for machined parts
An editable shipment-specific C of C with part revision, PO, quantity, lot traceability, certificate references and authorized signature fields.
Templates
CNC quote review checklist: a printable final pass
A practical CNC quote review template covering revision, material, quantities, routing, cost assumptions, lead time, and the customer response.