To move a quote into Global Shop Solutions, first agree whether the destination is a BOM, an estimate/router or a finished commercial quote. The vendor documents customer BOM import/export and estimates built from single-level or BOM routers; that does not establish a universal quote-import file format. Ask your ERP administrator for the supported path and a sample accepted by your installation. QuotedPart provides CSV/Excel exports, but those are source files for an agreed mapping, not a promised Global Shop Solutions connector.
See how QuotedPart connects to your workflow with its API, MCP server, autonomous quoting and shop-specific learning.
A BOM is not an approved selling price
Global Shop Solutions' own BOM and estimating pages were checked October 30, 2026. They describe BOM import/export, router creation, cost buildup and won-quote conversion to sales orders. A parts list can reach the ERP without carrying setup minutes, outside-service allowances or the estimator's approved margin. Treat those as separate data requirements.
Choose a record owner before building the transfer. If the ERP calculates final selling prices, send the source quantities and manufacturing assumptions and approve its result. If another estimator owns the customer price, verify how that approved number is retained and whether the ERP can recalculate it. Neither approach should leave two teams believing the other owns pricing.
| Information | Source meaning | Destination acceptance check |
|---|---|---|
| Customer/contact | Who receives and orders the work | Existing customer and correct currency |
| Part/revision | Drawing and estimate identity | No silent overwrite of another revision |
| Quantity breaks | Alternative order quantities | Each unit price attached to its own quantity |
| Setup/run | Per-lot time and per-piece time | Units and cost basis preserved |
| Outside process | Supplier cost, minimum and lead time | Separate vendor operation or agreed charge |
| Material/BOM | Stock or child-component requirement | Units and per-parent quantities correct |
Use a control total to catch a 60-times error
For an illustrative 25-piece part, assume 90 minutes of setup and six minutes run per piece at $100/hour. Setup costs $150 and run costs $250, for $400 operation cost. Add $250 material and $100 of outside finishing: total cost is $750. At 30% markup the approved quote is $975, or $39 each. Freight and tax are excluded.
A setup value of 90 must not become 90 hours, and six minutes per piece must not become six minutes for the whole order. Reconcile both times and costs after import. Also check the supplier minimum: an outside $100 lot charge becomes $4 per piece here, but should not stay $4 if the buyer orders five pieces under the same minimum.
Prove failure handling as well as success
Use a test company or administrator-approved staging process. Submit one part with a missing work-center code and require a clear rejection or review state. Then retry a successful transfer and confirm how duplicates are prevented. Keep the source quote identifier and imported record identifier together so a person can audit what happened.
Paperless Parts lists Global Shop Solutions among its live ERP integrations. Customiser describes a scoped export/API path rather than a pre-built connector. These are different kinds of handoff and should be evaluated as such. A vendor list alone does not prove which objects or revisions your configuration transfers. For QuotedPart, include mapping and reconciliation effort until your own accepted sample proves otherwise.
Sources and limits
Claims are dated where they can change. Product calculations are examples from the stated inputs, not a promise about a customer's quote. Competitor wording is attributed to the source shown.
- Global Shop Solutions: BOM import and export, BOM-to-router conversion, cost rollups, revision management and purchase/work-order creation are described. — source (checked 2026-10-30)
- Global Shop Solutions: Estimates use single-level or BOM routers; won quotes generate sales orders; repeat quotes reuse system data; estimated and actual time can be compared by job sequence. — source (checked 2026-10-30)
- Paperless Parts: Live ERP integrations named: Epicor (10/11/Kinetic), ECI (E2 Shop, JobBOSS, JobBOSS², M1), Fulcrum, Global Shop Solutions, Infor VISUAL/SyteLine, ProShop, Made2Manage, MIE Trak Pro (their words: “We currently have live integrations for the following ERP systems: Epicor (10/11/Kinetic), ECI (E2 Shop, JobBOSS, JobBOSS², M1), Fulcrum, Global Shop Solutions, Infor VISUAL / SyteLine, ProShop, Made2Manage, MIE Trak Pro.”) — source (checked 2026-11-04)
- Customiser: Global Shop Solutions handoff is described as CSV, Excel, PDF or REST API through a scoped connection rather than a pre-built connector. — source (checked 2026-10-30)
Price one of your own parts
Drop a PDF drawing or a STEP file. QuotedPart reads the print, measures the model and prices it in seconds, on default shop rates you can change.
Your STEP file or PDF drawingDrop a PDF drawing, a STEP file or both
Free. No account, no email. Priced at our default US rates until you set yours.
Related QuotedPart guides
Comparisons
E2 vs Global Shop Solutions: clarify the E2 product first
Distinguish legacy E2 SHOP, JobBOSS² and E2 MFG before comparing Global Shop Solutions, then audit BOM and release quantities.
Comparisons
Epicor Kinetic vs Global Shop Solutions: compare the whole job
A neutral comparison of documented manufacturing ERP scope, deployment and estimate-to-actual workflows, with an inter-site acceptance scenario.
Comparisons
Global Shop Solutions alternatives: choose the problem to replace
Compare the scope of JobBOSS², Fulcrum and ProShop before replacing an ERP, with a migration worksheet and a quoting-only alternative.
Comparisons
Global Shop Solutions pricing: build a complete ERP budget
No dollar price was published on the Global Shop Solutions pages checked. A first-year budget worksheet separates software, conversion, training and staff time.